Fort Perseverance: Difference between revisions
→Current Projects: add housing layout effort |
m fix wrong heading on housing layout |
||
| Line 31: | Line 31: | ||
The construction is 50% done as of the writing of this post. | The construction is 50% done as of the writing of this post. | ||
== Housing Layout == | === Housing Layout === | ||
Before the town can open up for building within it, a rough layout of the areas within it needs to be made first. Originally it was intended to be done after The Wall construction, but since there's some demand for people to join I'll try to make a rough layout a bit quicker now. | Before the town can open up for building within it, a rough layout of the areas within it needs to be made first. Originally it was intended to be done after The Wall construction, but since there's some demand for people to join I'll try to make a rough layout a bit quicker now. | ||