Fort Perseverance: Difference between revisions

m update images
m Gallery: fix Pages using gallery without a media namespace prefix
 
(3 intermediate revisions by the same user not shown)
Line 29: Line 29:


== Ongoing Projects ==
== Ongoing Projects ==
* BOXXYwhat's build project (Started around 2026.01.01, the southernmost red smudge on the western half of the base)
*cryptoki's base (Started on 2025.12.27, the easternmost red smudge)
*cryptoki's base (Started on 2025.12.27, the easternmost red smudge)
== Layout ==
== Layout ==
Line 41: Line 40:


== History ==
== History ==
<sub>(Written from the perspective of [[User:Miv2nir|Miv2nir]]).</sub><br>
<sup>(Written from the perspective of [[User:Miv2nir|Miv2nir]]).</sup><br>
The construction of the base has begun on 2025.05.07 during the period of my diploma work crunch, with a desire to construct a town with a consistent theme of spruce and stone, so as to have more of an old-school vibe to it.<br>
The construction of the base has begun on 2025.05.07 during the period of my diploma work crunch, with a desire to construct a town with a consistent theme of spruce and stone, so as to have more of an old-school vibe to it.<br>
As of right now, only a portion of the wall is constructed, which is made with schematics that I've designed back in 2021 in an effort to create a similar type of town on MCO.
As of right now, only a portion of the wall is constructed, which is made with schematics that I've designed back in 2021 in an effort to create a similar type of town on MCO.
=== The Wall ===
=== The Wall ===
[[File:Lspiters donation.jpg|thumb|The Soul III blaze powder as it is being used for wall heating]]
[[File:FP-Spawn-Towers-1.png|thumb|The spawn towers view]]
The Wall is part of the base meant to encircle the area in which the town buildings are to be located in.<br>
The Wall is part of the base meant to encircle the area in which the town buildings are to be located in.<br>
Construction of the wall has started around 2025.05.21 and was finished on 2025.12.21, taking exactly 7 months to complete.<br>
Construction of the wall has started around 2025.05.21 and was finished on 2025.12.21, taking exactly 7 months to complete.<br>
Line 54: Line 53:
The town was opened up on December 27th, 2025, now welcoming any members of The Interserveral within its borders.
The town was opened up on December 27th, 2025, now welcoming any members of The Interserveral within its borders.


=== The Spawn Towers ===
The Spawn Towers is a build project done by [[User:BOXXYwhat|BOXXYwhat]], started around Jan 1st and finished around Jan 10th of 2026, and is one of the first structures seen when entering the base from the southwest dial.


== Gallery ==
== Gallery ==
Line 63: Line 65:
|file:Fort Perseverance 2025 12 21 dynmap.jpg
|file:Fort Perseverance 2025 12 21 dynmap.jpg
|State of the base on 2025.12.21 from dynmap
|State of the base on 2025.12.21 from dynmap
|file:Lspiters donation.jpg
|The Soul III blaze powder as it is being used for wall heating
|file:FP-Spawn-Towers-2.png
|The Spawn Towers at night
}}
}}


[[Category:Bases]]
[[Category:Bases]]